Vitali – Milan
Italy
For the cemented mixture and ready-mix production for the extension of the highway A8 Milano – Laghi, Vitali Spa group has chosen FAST 2 MIX-MC PRO, the most complete mobile solution on the construction market, which includes the production speed and capacity of a continuous plant and the ease of mobility with the precision of batching plant. It is an excellent solution for road construction sites and for the construction of airports, parking lots and squares and, in general, wherever minimum dimensions, mobility and speed of handling are required.
For the cemented mixture and ready-mix production for the extension of the highway A8 Milano – Laghi, Vitali Spa group has chosen FAST 2 MIX-MC PRO, the most complete mobile solution on the construction market, which includes the production speed and capacity of a continuous plant and the ease of mobility with the precision of batching plant. It is an excellent solution for road construction sites and for the construction of airports, parking lots and squares and, in general, wherever minimum dimensions, mobility and speed of handling are required.
The operating principle involves a dosing process through extraction of products at controlled weighing with high level of precision. The introduction of a second independent dosing system for dusty materials, makes the plant suitable for use in procurement where highway specifications require the use not only of cement, but also of fillers.
The plant is equipped with an innovative continuous double-shaft mixer MEC 150 that, through the control by inverter and thanks to the possibility of tilting, ensures an adequate time of permanence of the individual components inside the mixing room, ensuring unequalled homogenisation states.